Location: Smederevo, Serbia
Date Completed: 2005
Project Description:
In support of our customer’s efforts to increase
capacity on their continuous caster Globex Group was
tasked with providing detailed design for the tundish
cars on the casting platform used to move tundishes
into the casting position.
Characteristics:
Hydraulic fluid is used on the car for the following
functions:
1. lifting and lowering tundishes
2. horizontal movements
3. operations with casting steel
4. Removal of tube changer stopper rod
Project Phases:
- Detailed Design for equipping the tundish car
- Detailed Electrical design for new equipment
- Detailed Electrical design for integrating new and
existing equipment
- Detailed Civil Design and modification to casting
floor layout
- QA during Installation
- Start-Up
- Testing
|